Customization: | Available |
---|---|
Warranty: | 1 Year |
Shaping Mode: | Injection Mould |
Still deciding? Get samples of US$ 0.1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Place of Origin: | Xiamen,China | Application: | Medical Device |
Cavities Number: | 1 | Shaping Mode: | Plastic Injection Mould |
Cycle Time: | 25s | Mould material: | P20/718/2344/Nak80/S136/2738/2316 |
Injection Material: | ABS | Mould Life: | 0.5-1 Million Shots |
Mold base: | KM.HASCO. DME or Chinese standard | Tolerance: | ±0.02mm |
Drawing Format: | STEP/STP/IGS/X-T/STL/CAD/PDF/DWG and Other | Warranty: | 1year |
Runner: | Cold Runner | Certification: | ISO13485 |
Core Advantage of XinHaiSheng
1) High quality with cost-saving design
Our engineers with over 10 years' experience would design the plastic injection molds with the most reasonable design.
2) Commitment to Quality & Competitive Price
With diversity in equipment capabilities and in-depth knowledge about industrial injection mold, Xin Hai Sheng is able to offer Competitive Price for all products and services reasonably.
3) Delivery on time within budget
We help customers control costs, create and execute the most efficient schedule for each project, taking full advantage of our supply chain network and mold processing and injection molding capabilities.
4) High quality service
At Xin Hai Sheng, the fast-response service is just the basic requirement, professional and efficient are our strength!
5) One-stop service provider
Technical support from the initial product design to the entire stage of mold making and product production and delivery.
We Can Offer You:
1.Good steel with high hardness
2.Good accessories with high brightness
3.Good machining with high precise
4.In-time response on email, telephone calls or fax
5.In-time supply the quotation and mould designs
6.In-time communication on the technical points
7.In-time sending pictures for the mould machining progress and mould finishing schedule
8.In-time mould test and sample delivery
9.In-time mould delivery
Sale Services
Pre-sale service:
Our company provide good salesman for professional and promptly communication.
In-sale service:
We have strong designer teams, will support customer R&D. If the customer send us samples, we can make product 3D mapping, modeling and drawing, then do the modification as per customer request and send to customer for approval. Also we will provide customers our technological suggestions according to our experience and knowledge.
After-sale service:
We will provide some spare parts for the easy-to-break parts, you can replace when you need. If our product have quality problem during our guarantee period, we will give you the best solution at the fastest speed, and send you free for replace the broken piece; also if you have any issue in using our moulds, we will provide you professional communication.
Other Services
We make the commitment of service as below:
1.Lead time: 30-50 working days
2.Design period: 1-5 working days
3.Email reply: within 24 hours
4.Quotation: within 2 working days
5.Customer complaints: reply within 12 hours
6.Phone call service: 24H/7D/365D
7.Spare parts: 30%, 50%, 100%, according to specific requirement
8.Free sample: according to specific requirement
Q1: Are you trading company or manufacturer?
A1: We are direct factory for mould making with more than 10 years experience.
Q2: Where is your factory located? How can i visit there?
A2: Our factory is located in Tong'an District, Xiamen City, China. 20 minutes by car from Xiamen International Airport , 15 minutes from train station to our factory.We can pick you up if you need,welcome to visit our factory.
Q3: What do we need for mould quotation?
A3: We usually need the following information,
(1) Mould steel raw material you need or mould life you need.
(2) Mould cavity No. you want?
(3) 2D or 3D product drawing, or pictures with detail sizes information (length, width, height, thickness), or send samples directly to us.
(4) Raw material of the product.
(5) Hot runner or cold runner, if hot runner which brand of hot runner you require.
Q4:How long does it take to make a mould?
A4:The production time depends on your specific requirements, normally the lead time is 10-60 days.
Q5:Do you offer secondary services such as assembly, packing or painting?
A5:Yes, such as assembly, painting, tapping, ultrasonic welding, trimming, sorting, custom packaging and etc.
Q6:If I have existing tooling, can you use it to mould my project?
A6: Absolutely, if you have existing tooling we can use it.
Q7: How about quality control in your factory?
A7: We believe that "quality comes before everything". We mainly carry out the following procedures:
(1) Design optimisation inspection
(2) mould steel hardness inspection
(3) mould assembly inspection
(4) Mould trial sample inspection.
(5) Final mould & packaging inspection before shipment
Please send us 3D/2D drawings or samples if you have any queries regarding the above.